If you’re installing solar panels or a heat pump, DNO approval is a must.

 

But what is the DNO? Why do you need their permission? And how does EcoGlow handle it for you? Let’s break it down. 

Book My DNO-Compliant Install

What’s Involved in My Survey?

What Is the DNO? 

DNO stands for Distribution Network Operator — the company that owns and operates the electricity infrastructure in your area (cables, substations, transformers). 

There are 6 main DNO regions in the UK, including UK Power Networks, Western Power Distribution, and Northern Powergrid. 

The DNO is not your electricity supplier — but they control whether new energy-generating or high-load devices (like solar PV or heat pumps) can connect safely to the grid. 

When Do You Need DNO Approval? 

Scenario

Approval Needed?

Installing Solar PV (3.6kW+) Yes — G99 or G98 submission
Adding Battery Storage Usually  especially if exporting to grid
Installing Heat Pump Yes — due to high starting current
Just changing appliances Not usually, unless load changes drastically

We Handle All DNO Submissions

What’s the Process?

  1. We complete a G98 or G99 application 
    • G98 = small-scale, often after install 
    • G99 = larger systems or export  must be pre-approved 
  2. DNO assesses the system’s impact on the grid 
    • May request additional info (e.g., inverter spec, site maps) 
  3. Approval returned in 1–4 weeks 
    • We track this and coordinate your go-live date 
  4. You receive formal documentation 
    • Often required for SEG payments and legal compliance 

                  How Long Will My DNO Take?

                  See My Install Timeline

                  What Happens If You Don’t Get DNO Approval? 

                  • Your system may not be legally connected 
                  • You may not be allowed to export energy 
                  • SEG payments may be withheld 
                  • You risk voiding your warranty or insurance 

                   

                    How EcoGlow Handles It 

                    • We manage the entire DNO application for every install we do

                    • We use pre-approved system designs to speed up the process

                    • We track and communicate all updates to you 

                    • You receive final approval documentation with your install pack 

                       

                        Book a DNO-Ready Survey

                        Check My Install Timeline

                        Will DNO approval delay my install?

                        Sometimes — G99 approvals can take up to 4 weeks. We apply early.

                        Do I need to talk to the DNO myself?

                        No. EcoGlow handles it entirely for you.

                        Can I still get SEG payments without DNO?

                        No. MCS + DNO documentation are required to register with SEG suppliers. 