What Is the DNO and Why Does It Matter? 

If you’re installing solar panels or a heat pump, DNO approval is a must. 

But what is the DNO? Why do you need their permission? And how does EcoGlow handle it for you? Let’s break it down. 

Book My DNO-Compliant Install

What’s Involved in My Survey?

book your free home survey today

01932 550828

EMAIL

info@ecoglow.uk.com

What Is the DNO? 

DNO stands for Distribution Network Operator — the company that owns and operates the electricity infrastructure in your area (cables, substations, transformers). 

There are 6 main DNO regions in the UK, including UK Power Networks, Western Power Distribution, and Northern Powergrid. 

The DNO is not your electricity supplier — but they control whether new energy-generating or high-load devices (like solar PV or heat pumps) can connect safely to the grid. 

    When Do You Need DNO Approval? 

    Scenario

    Approval Needed?

    Installing Solar PV (3.6kW+) Yes — G99 or G98 submission
    Adding Battery Storage Usually  especially if exporting to grid
    Installing Heat Pump Yes — due to high starting current
    Just changing appliances Not usually, unless load changes drastically

    We Handle All DNO Submissions

    What’s the Process? 

    1. We complete a G98 or G99 application 
      • G98 = small-scale, often after install 
      • G99 = larger systems or export  must be pre-approved 
    2. DNO assesses the system’s impact on the grid 
      • May request additional info (e.g., inverter spec, site maps) 
    3. Approval returned in 1–4 weeks 
      • We track this and coordinate your go-live date 
    4. You receive formal documentation 
      • Often required for SEG payments and legal compliance 

                    How Long Will My DNO Take?

                    See My Install Timeline

                    What Happens If You Don’t Get DNO Approval? 

                    • Your system may not be legally connected 
                    • You may not be allowed to export energy 
                    • SEG payments may be withheld 
                    • You risk voiding your warranty or insurance 

                     

                      How EcoGlow Handles It 

                      • We manage the entire DNO application for every install we do

                      • We use pre-approved system designs to speed up the process

                      • We track and communicate all updates to you 

                      • You receive final approval documentation with your install pack 

                         

                          Book a DNO-Ready Survey

                          Check My Install Timeline

                          Will DNO approval delay my install?

                          Sometimes — G99 approvals can take up to 4 weeks. We apply early.

                          Do I need to talk to the DNO myself?

                          No. EcoGlow handles it entirely for you.

                          Can I still get SEG payments without DNO?

                          No. MCS + DNO documentation are required to register with SEG suppliers. 

                          We’ll Get You Connected  Legally, Safely, and Smoothly 

                          Book a DNO-Compliant Install

                          Talk to a Retrofit Advisor

                          Ready to cut costs and carbon?

                          Get started today. Simply fill in the form below, and a member of our team will contact you within one working day.